Spleen Help Center
Command Palette
Search for a command to run...

Managing Multiple Projects

When several projects need the same action, you can manage them together from the projects overview. Bulk actions let you archive, unarchive, export, or permanently delete several selected projects without opening and handling each one separately.

Bulk actions are available only in table view. Grid view is designed for browsing projects visually and does not show the selection controls. Switch to table view when you want to work with several projects at once.

Selecting projects

In table view, use the checkbox beside a project to select it. You can select several rows individually, or use the checkbox in the heading of the Other projects table to select every project on its current page. A table page contains up to 10 projects.

Projects in a series have their checkboxes once their series is open. The series table has no select-all box: open the series you want and tick its projects. A selection can hold projects from both tables at once, and the bulk actions act on all of them.

A selection only ever holds projects you can see. Moving to another page, or closing a series, deselects the projects that leave the screen, so a bulk action never reaches a project you are not looking at.

Once one or more projects are selected, the row above the table changes to show how many are selected, such as 3 projects selected, followed by Export, Archive, and Delete. Clear selection at the end of the row deselects everything and brings back the usual buttons. The table stays where it is while you select, so the rows do not move under the pointer.

Three projects selected across both tables, one in an open series, with the Export, Archive, and Delete bulk actions

Review the selected rows before continuing, especially when the table has been searched, sorted, or filtered.

Archiving selected projects

Choose Archive to move all selected active projects out of the active projects list. In the archived view, the matching bulk action is Unarchive, which returns selected projects to the active list.

Archived projects are not deleted. Their documents, structure, notes, annotations, and other project data remain intact. You can find them again under Archived and return them to the active list later.

Archiving is useful for completed, paused, or inactive work that you want to keep without leaving it among your current projects.

Exporting selected projects

Choose Export to create exports for up to 10 selected projects.

In the export dialog, choose the file format and the type of download package. Each selected project is exported as its own file, and the resulting files are collected into a single downloadable archive.

The Format menu includes PDF, EPUB, HTML, Markdown, and Spleen archive, plus Word (A4) and Word (Letter) on the Library plan. Print PDF is not offered here, since its trim size and front matter are chosen per project; export it from the project’s own actions menu. When you select PDF or HTML, Include table of contents appears and starts selected. The Download as menu lets you choose Zip (.zip) or Compressed tar (.tar.gz). The dialog explains what will be created before the export begins.

Export is the only bulk action limited to 10 projects. If more than 10 are selected, deselect projects until 10 or fewer remain before exporting. Archiving, unarchiving, and deleting act on the whole selection.

Deleting selected projects

Choose Delete only when you are certain that the selected projects are no longer needed.

Bulk deletion permanently removes every selected project and its associated data. Because this action cannot be undone, Spleen opens a confirmation dialog showing how many projects will be removed.

The dialog also offers archiving as a safer alternative. If you may want to return to the projects later, archive them instead.

The bulk delete dialog is titled Delete 3 projects?, with the number changing to match your selection. For one selected project, it says Delete 1 project?. The warning says, “This permanently deletes 3 projects and all related data, and cannot be undone.” To confirm permanent deletion, type delete into the field labelled Type delete to confirm, then choose Delete.

Good to know

  • Bulk actions are available only in table view.
  • The checkbox in the Other projects heading selects every project on its current page, up to 10.
  • Projects in an open series can be selected alongside the other projects.
  • Changing page or closing a series deselects the projects that leave the screen.
  • Bulk export is limited to 10 projects; the other bulk actions are not.
  • The number shown in each action button is the number of currently selected projects.
  • Archiving is reversible; deletion is permanent.
  • Bulk export creates a separate export file for each project and combines them into one download.
  • Actions for one project remain available from its own menu when no bulk selection is needed.